Ii, Ollinkorpi

General

ILMATAR is developing a major wind farm consisting of ca. 50 to 75 turbines in the municipality of Ii in the region of North Ostrobothnia. The site is especially well suited for wind power production, as it is a vast, uninhabited forestry area with great wind potential.

ILMATAR utilizes the latest technology for all of the development projects in the portfolio. The permitted maximum height of the planned turbines in Ii is 300 meters. The permitting was started in 2019 and the wind farm will be operational in mid-2020’s.

Asset management

Once operational, Ilmatar Service Oy will ensure the high quality of the technical and commercial management of the wind farm.

ILMATAR kehittää Iin kunnan Ollinkorven alueella merkittävää noin 50-75 modernin tuulivoimalan puistoa. Suunnittelualue on kooltaan yli 100 km2. Alue sijaitsee Iin taajaman koillispuolella ja Olhavasta kaakkoon. Iin Ollinkorven laaja asuttamaton metsätalousalue sekä hyvät tuuliolosuhteet tarkoittavat, että alue soveltuu erinomaisesti tuulivoimakäyttöön.

Hankkeen yhdistetty kaava- ja ympäristön vaikutusten arviointi (YVA) -prosessi aloitettiin alkuvuodesta 2019. ILMATAR hyödyntää aina edistyksellisintä voimalateknologiaa kehityshankkeissaan. Ollinkorven hankkeen voimaloiden suunniteltu lavan pyyhkäisykorkeus on 300 metriä ja yhden voimalan teho on vähintään 5 MW. Tuulipuiston käyttöönotto arvioidaan ajoittuvan viimeistään 2020-luvun puoleen väliin.

ILMATAR tekee alueelle maanvuokrasopimuksia alkuvuoden 2019 aikana. Ehdotettu sopimus on tehty yhteistyössä paikallisten sidosryhmien kanssa. Karttalinkistä pääsee tarkastelemaan suunnittelualueen rajausta. Jos maanvuokraus alueelta kiinnostaa, olethan yhteydessä: Petteri Mäenpää, +358 405211764.

Lisätietoja hankkeesta:

Pentti Itkonen
Ilmatar Windpower Oyj
hankekehitysjohtaja
+358 41 504 9935